|
Equipment designed for Environmental Applications... |
|
Checkmag measures and logs Final Effluent
|
||
|
This flowmeter is installed at a MOD site to measure the flow of final effluent into lagoons. It is a requirement of the EA that the daily volumes of final effluent are logged and reported. The MOD site had no facility for this. The solution was to install a 4 electromagnetic meter Checkmag on an upward incline in a new chamber next to the drain. This ensured that the meter always remained full. After the meter - the effluent spilled over into the original drain and on into the lagoon. An integral part of the Checkmag flow converter is the data
logger, which will log the daily flow of final effluent over a four month
period. |
||
![]() |
||
|
||
|
|