Configuration Management Plan Section 7 - Model Text

7. SUBCONTRACTOR/SUPPLIER CONTROL

A procedure for the control and surveillance of suppliers shall be provided to ensure:

7.1 Control procedure for equipment and specifications.

The Change Control procedure for equipment and specifications shall be in accordance with this 'Configuration Management Plan'.

When a change requires a baseline change (specification) this shall be stated on the relevant submitted CP, and the specification changed by the design authority configuration change authority.
In some cases time can be saved if the participating company completes the CO, where the change is requested by the acquirer and forwards it to the developer for completion.

If software is affected, change control will be via the Software Configuration Management Plan procedures (see section 10).

7.1.1 Proposal form.

 

7.1.2 Waivers/concessions.

Under construction. 



LE FastCounter

Back to Home page
Back to CMP page
Back to Top of this page

For Home page MANAGING STANDARDS

kenr@wysywig.airtime.co.uk

Originated on the 17th of July 1995
Please send any beneficial comments or identification of errors using the following form to: kenr@wysywig.airtime.co.uk

Copyright © by Ken Rigby 1995, 1996, 1997, 1998