The Configuration Manager should report to the Project Manager the status of the system/subsystem configuration on a regular basis. To be continued
The relationship between configuration management
at the configuration item level, and its relationship to the work
authorization and cost control in individual facilities will be
described in the Development/Engineering Program plan documentation.
Specific critical events defining the relationship to configuration
management and schedule control of the project program, for example,
sequencing of Design (Formal Technical) Reviews, release of engineering,
production, test, logistic support events, Formal Audits, Speciality
plans, etc., will be described.