of Consequences | Factors | Factors | Factors |
| Minimal | Budget Estimates not exceeded. Some transfer of $ | Within Available Slack. | |
| Some Reduction in Performance | Exceed Budget by 1 to 5% | Minor Slip in Schedule. Some Milestones Adjusted. | |
| Some Reduction in Performance | Cost Estimates Increased by 5 to 20% | SmallSlip | |
| Significant Degradation in Performance | Cost Estimates Increased by 20 to 30% | 3 monthsslip | |
| Technical Goals Not Met | Cost Estimates Increase 50% | Schedule Slips Impact System Milestones. |
Determine a value for each of the three columns. Average these three values. This average is the Pc factor.