Consequence Factors

Significance
of
Consequences
Technical
Factors
Cost
Factors
Schedule
Factors
Low (0.1)
Minimal Budget Estimates not exceeded.
Some transfer of $
Within Available Slack.
Minor (0.3)
Some Reduction in Performance Exceed Budget by 1 to 5%Minor Slip in Schedule. Some Milestones Adjusted.
Moderate (0.5)
Some Reduction in PerformanceCost Estimates Increased by 5 to 20% SmallSlip
Significant (0.7)
Significant Degradation in PerformanceCost Estimates Increased by 20 to 30% 3 monthsslip
High (> 0.9)
Technical Goals Not MetCost Estimates Increase 50% Schedule Slips Impact System Milestones.

Consequence Factors

Determine a value for each of the three columns. Average these three values. This average is the Pc factor.