The information provided here shall provide details for general guidance on the 'Systems Engineering Detailed Schedule' (SEDS).
The SEDS is a detailed schedule of the tasks to be
done to satisfy the 'Systems Engineering Master Schedule
(SEMS).
The SEDS provides a activities Vs time visible display into the
progress and risks involved in completing technical tasks.
The purpose of the SEDS is to support the SEMS and risk management
of critical program activities.
The SEDS should be prepared using a 'industry standard'
Project Management Tool mutually agreed between the acquirer and
supplier.
The SEDS shall show vertical and horizontal traceability Through
the cost reporting system, Work Breakdown structure (WBS), SEMS,
and SOW.
The scheduled activities shall be consistent and unambiguously
defined. List all abbreviations and include any definitions not
defined in the applicable dictionary or higher level documentation,
i.e., Program Plan, System Engineering Management Plan,
etc.
The SEDS shall contain an integrated network-based schedule to include events and their definition, network-based detail schedules with associated higher order intermediate and summary level schedules, and periodic analyses of progress to date.
Key elements shall be: