The Equipment, HWCIs, and CSCIs being developed by
the subcontractors/suppliers shall be formally reviewed were applicable
in accordance with this SEMP reference.
These reviews shall be accomplished by the acquirer or is appointed
agent with the system design authority and responsibility for
the subcontracted products.
Acquirer participation in the subcontractor/vendor reviews shall
be decided on a case by case basis as directed by the project
manager.
The monitoring and control of subcontractors and suppliers is
of vital importance in the development of reliable and maintainable
equipment and systems, as high reliability and maintainability
can only be achieved if the same standards that the prime contractor
or overall supplier establishes are applied to all of the subcontractors
and suppliers.