Organizational elements responsible for the technical
program effort shall be identified and lines of communication
defined for control of resources and accomplishment of specific
elements of the CWBS/SOW.
Detailed work authorization (work orders/directives) shall be
compatible with the cost/schedule control system and shall include
technical measures of task accomplishment.
The Statement of Work (SOW) shall contain
the specific allocation of work to each participating company
together with the technical measures of task accomplishment.
Details of Work Authorization shall be contained in the Statement
of Work(s) for the Development and Production Phases.
When a supplier has not been design approved, the contractor shall
either incorporate the design of the sub-contracted items (other
than standard parts) in his own drawings or ensure that the sub-contractor
conforms to this plan.
Before placing a sub-contract for any significant design and development
work the acquirer or his agent shall be informed of the name of
the sub-contractor, the nature of the work and the technical requirements.
The design of furnished equipment shall not be altered
without the owners authority. If any doubt about the design suitability
of any item or has proposals for design changes the owner shall
be informed at the earliest opportunity.
The developer shall ensure that the design of the installation
using furnished equipment is in accordance with the specific requirements
of such equipment.