|
STONEWORK REPAIR - McINTYRE
+ HOGG BUILDING
1. UPPER PARAPET STONEWORK REMOVED AND BASE STONES
MADE GOOD ON TOP SURFACE
2. INTRODUCE DRIP CHECK DETAIL, REFORMING EXISTING CORNICE
TO 75mm DEEP.
3. DENTILS REFORMED TO SLOPE AND DRESSED BACK TO SOUND
BASE
4. RESTORATION MORTAR REPAIR TO RE-ESTABLISH DETAIL
5. INTRODUCE DRIP CHECK DETAIL, REFORMING EXISTING CORNICE
TO 75mm DEEP.
|