|
Year
|
Client/
Location
|
Description of Work
|
Reference
|
|
95/96
|
Enterprise/
Italy
|
Review legislation, methods of waste disposal and logistics for onshore disposal of drilling waste in Brindisi.
|
Enterprise Oil Exp. Ltd
Via dei Due Marcelli
Rome, Italy
|
|
94/95
|
Statoil/
Norway
|
Design & joint development of mud cuttings separator to reduce oil lost with cuttings (joint patent application).
|
Gunnar Sirevag, Statoil
PO Box 300, Stavanger
Norway
|
|
94/96
|
Burgess &
Garrick/
UK
|
Assistance with purchase, installation and commissioning of Turbo Thermic oil/solids separation unit.
|
Burgess & Garrick (Oil
Services) Ltd.
Sellaness, Mossbank
Shetland, Scotland
|
|
92/93
|
RAM Env.
Services/
UK
|
Design & development assistance with new cuttings slurrying & subsurface injection system. Marketing, commissioning and operation of system.
|
RAM Environmental Services
Depot Road, Huntly
Aberdeenshire
Scotland
|
|
92/93
|
Damath/
Saudi Arabia
|
Site evaluation and conceptual design study for oil recovery & cleaning of 20,000 tons crude oil polluted sand.
(subcontract Alba International)
|
Alba International Ltd.
Leading Light Building
142 Sinclair Road
Aberdeen, Scotland
|
|
92
|
Rana
Kommune/
Norway
|
Provision of proposal for cleanup and treatment of redundant industrial site polluted with oil/inorganics.
(subcontract Veidekke A/S)
|
Veidekke A/S
Bergerveien 6
1361 Billingstadsletta
Norway
|
|
92
|
John Brown/
CIS
|
Conceptual design studies for oil recovery from, and treatment of, refinery sludges.
|
John Brown Engineers Ltd.
20 Eastbourne Terrace
London W2 6LE, England
|
|
91/92
|
Baku Invest/
Azerbaijan
|
Development of conceptual treatment plan for oil recovery & cleanup of polluted lake.
On site inspection & testing for the above.
(subcontract to Alba International).
|
Baku Invest
37001 Baku
UL Maligina 10
Azerbaijan
|
|
89/91
|
BP &
Amerada Hess/
UK
|
Project management for development of solvent extraction process for oil/solids separation & oil recovery.
(subcontract to Thule Rigtech)
|
Thule Rigtech
South College Street
Aberdeen
Scotland
|
|
90
|
Karmoy
Kommune/
Norway
|
Safe removal & disposal of process & aboratory chemicals from disused copper mine.
(subcontract to Norsas)
|
Norsas a/s
Jakob Askelandsveien 3
4033 Forus, Norway
|
|
89
|
Shell
Refining/
Norway
|
Investigation for treatment of crude oil residues for oil recovery/disposal.
Site treatment of the above.
(subcontract to S & D Oilteknik B.V.)
|
Norsas a/s
Jakob Askelandsveien 3
4033 Forus, Norway
|
|
89
|
BP Norway/
Norway
|
Audit to assess reasons for non-performance of cuttings cleaning equipment.
|
BP Norway U.A.
Forusbeen 35
4033 Forus, Norway
|
|
89
|
BP/
UK
|
Feasibility study of potential for slurrying oil contaminated cuttings and injecting subsurface.
|
BP Exploration
Farburn Industrial Estate
Dyce, Aberdeen, Scotland
|
|
89
|
BP/
UK
|
Review of rig designs to assess ease & cost of installing systems for cuttings collection.
|
BP Exploration
Farburn Industrial Estate
Dyce, Aberdeen, Scotland
|
|
88
|
in house
|
Design of solvent extraction process for oil/solids separation and recovery of the separated oil.
|
n/a
|
|
88
|
Norsk Hydro/
Norway
|
Removal & treatment of 2000 drums of coal tar from Sundalsøra site.
(subcontract to Mourik B.V.)
|
Norsas A/S
Jakob Askelandsveien 3
4033 Forus, Norway
|