A Tylo Commercial Sauna and Glass-fronted Steam Room were also installed in the pool hall for players' recuperation and relaxation.
Engineers also worked alongside US manufacturer
Hydroworx to install a high-tech hydrotherapy pool and hot and cold plunge spas within the pool hall.
The
Hydroworx 2000 therapy pool is the first full-spec model to be commissioned in the UK, and features a variable speed underwater treadmill, directional resistance jets, moveable floor and underwater video monitoring system.