the dean's eye window, lincoln cathedral

The setting out of the window onto the setting out floor has now taken place and the banker masons have started to work the stone.


The following images are a photo library of the progress on Dean's Eye window.

Recording & checking details of the existing window
Creating CAD model using photarc survey

Checking full size CAD plots with restored glazing
Grid & opening profile drawing

Marking Grid on setting out floor
Marking opening profile on setting out floor

Laying full Size templates on setting out floor
Full size templates complete from those on the left
Full size templates complete at Ground level

Stones being worked
Stones being carved
Stones worked on setting out floor

Masons with completed window on setting out floor
Calibration of laser line for fixing
Laser line in place on site

Stones lifted into place
Stones being drilled for cintec anchor
Completion of fixing outer roundels
 

 

stewart design (uk) limited
the old bakery, sheep street, charlbury, oxon, OX7 3RR
telephone +44 (0)1608 811500, fax +44 (0)1608 811700
e-mail: design@stewartdesign.co.uk
CLICK HERE IF YOU CANNOT SEE THE NAVIGATION